Construction Site: Reinforced Concrete Slab construction in Newcomb
Notice how the reinforcing mesh placed on top of the bar chairs. The bar chairs are evenly placed on top of the polythene membrane.
Notice how servicing pipes are installed before the concrete slab being constructed.
Pouring the cement evenly to the escavated site.
A pre-mixed cement truck arrive on site.
Reinforced concrete slab seating on a polythene membrane.
1 comment:
Jeremy Ham's Construction Blog
said...
great images!
April 22, 2007 at 3:01 AM
Post a Comment
Newer Post
Older Post
Home
Subscribe to:
Post Comments (Atom)
Blog Archive
▼
2007
(17)
►
May
(5)
▼
April
(9)
Major Project: Concept & Detail Development
Construction Site: Tilt Up Panel Construction 2 in...
Construction Site: Reinforced Concrete Slab constr...
Construction Site: Tilt Up Panel Construction in N...
Drawing Exercise: Downpipe connect to Box Gutter D...
Drawing Exercise: Downpipe Detail at 1:5 Scale
Drawing Exercise: Gutter Detail at 1:5 Scale
Drawing Exercise: Capping Detail at 1:2 Scale
Drawing Exercise: Office Attachment to Warehouse
►
March
(3)
About Me
David Chung
View my complete profile
1 comment:
great images!
Post a Comment